KIWL 3000 L Brewhouse Equipment
The 3,000 L equipment set for breweries entering regional volume, where steam, heat recovery and recipe automation all become standard rather than optional.
Key Specifications
| Batch size | 3,000 L per batch |
|---|---|
| Vessel configuration | 4 or 5 |
| Heating | Steam 1.1 t/h with heat recovery |
| Material | 304 stainless |
| Brews per day | 6-8 per day |
| Footprint | 62 m2 |
The size where steam stops being optional
At 3,000 L, electric heating would need roughly 130 kW and a supply upgrade that rarely makes sense. Steam also allows the wort boiler that shortens boils at this volume, so the utilities decision is effectively made for you.
Cellar and packaging follow the brewhouse
Eight brews a day at 3,000 L is 24,000 L of green beer daily, which needs 60,000-80,000 L of fermenter capacity and a packaging line rated above 12,000 BPH. The brewhouse is rarely the constraint at this scale.
Typical Applications
- Breweries planning around a 3,000 batch — At 6-8 per day the brewhouse delivers roughly 45,000 hl of finished beer per year on a five-day week, which sets the cellar and packaging requirement downstream.
- Sites with 62 of available floor space — The 4 or 5 layout fits within 62 m2, and the vessel arrangement determines how much of that space must stay clear for cleaning access.
- Plants committed to steam heating — Steam 1.1 t/h with heat recovery is the practical choice here: it removes the boiler room below 2,000 L per batch, while larger sizes recover the cost of steam through faster ramp rates and tighter control.
Related Equipment
Frequently Asked Questions
What steam boiler size is needed?
About 1.5 t/h at 6 bar to cover the brewhouse plus CIP and pasteurisation peaks.
Can the equipment set be supplied without installation?
Yes. Equipment-only supply is available, though installation supervision is recommended at this scale.
What is included with the 3,000 configuration?
The supply covers the 4 or 5 set, interconnecting sanitary piping, the control panel and CIP routing, with Steam 1.1 t/h with heat recovery as specified. Cellar tanks, packaging and building works are separate scope, so the plant can be sized to your own distribution plan rather than a fixed package.
Explore more: All Products · Industry News. Ready to discuss your project? Request a quote.