Brewery and Beverage Plant Solutions
Solutions are organised by the problem being solved rather than by machine type, because most breweries buy a process, not a catalog item.
Starting a brewery from an empty building
A turnkey project covers process design, equipment, utilities, installation and commissioning under one contract. The sequence starts from beer styles and target volume, then sizes the brewhouse, cellar and packaging to match, which avoids the common outcome of a brewhouse that cannot reach rated output because the chiller was undersized.
Expanding an existing brewhouse
Most expansions do not need a new brewhouse. Adding a whirlpool, a hot liquor tank or a second kettle raises output on the same platform, and matching fermenter capacity to the new brewhouse volume is usually the larger constraint. A capacity study before ordering equipment is cheaper than correcting a mismatch later.
Moving from keg to packaged product
Bottling and canning lines are specified from the filler backwards, with buffer conveyors sized from measured accumulation time. Oxygen control is the design driver: neck-handling transfer, counter-pressure filling and pre-purge before seaming are what determine shelf life, not the rated speed on the brochure.
Cutting water, energy and chemical cost
Heat recovery on wort cooling, caustic recovery on bottle washing and counter-current rinse on both are the three measures with the shortest payback in a brewery. Together they typically cut utility and chemical spend by 20-35 percent.